Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Note This content applies to the Windows Logo Kit (WLK). For the latest information using the new Windows Hardware Certification Kit (HCK), see Windows HCK User's Guide on the Windows Hardware Dev Center.
The following toolbar buttons are available on the Schedule Jobs form:
Open a saved fileOpens an existing file saved for scheduling. You can update the information again and overwrite it.
Save current component to a fileSaves current schedule data, including all settings.
Print the current component dataPrints current schedule data.
CutCuts the selected information or job from its current location within the scheduler.
CopyCopies the selected information or result from its current location within the scheduler.
PastePastes cut or copied information or results to a selected location within the scheduler.
Create scheduleCreates the new schedule.
Related topics
Build date: 9/14/2012