Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
This automated test is a stress test that verifies system stability during process destruction.
This test creates many processes that do windowed and full-screen d3d9 rendering. The test then asynchronously terminates these processes. Drivers must not cause the system to stop responding (hang) or crash while running this test.
Test details
Associated requirements  | 
Device.Graphics.WDDM.DisplayRender.Base  | 
Platforms  | 
Windows 7 (x64) Windows 7 (x86) Windows RT (ARM-based) Windows 8 (x64) Windows 8 (x86) Windows Server 2012 (x64) Windows Server 2008 R2 (x64) Windows RT 8.1 Windows 8.1 x64 Windows 8.1 x86 Windows Server 2012 R2  | 
Expected run time  | 
~5 minutes  | 
Categories  | 
Certification Functional  | 
Type  | 
Automated  | 
Running the test
Before you run the test, complete the test setup as described in the test requirements: Graphic Adapter or Chipset Testing Prerequisites.
Troubleshooting
For troubleshooting information, see Troubleshooting Device.Graphics Testing.
More information
Command syntax
| Command option | Description | 
|---|---|
Processcallout.exe  | 
Runs the test job.  | 
File list
| File | Location | 
|---|---|
Configdisplay.exe  | 
<[testbinroot]>\nttest\windowstest\tools\  | 
Processcallout.exe  | 
<[testbinroot]>\nttest\  | 
TDRWatch.exe  | 
<[testbinroot]>\nttest\windowstest\graphics\  |