Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Help Text: Should the costing sheet results be displayed for production estimation or production costing?
Style: ComboBox
Values
| Name | Value | Description |
|---|---|---|
| Estimation | 0 | Estimation |
| Costing | 1 | Costing |