Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Is called when the period code field is modified and changes the values in the From date field and the To date field.
Syntax
private boolean fld900_1_modified()
Run On
Called
Return Value
Type: boolean
true if the control values are modified successfully; otherwise false.