Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Defines a period when a resource is available.
<AvailabilityPeriod>
  ComplexTypeValue
</AvailabilityPeriod>
Parent Elements
Child Elements
| Element | Required / Optional | Description | 
|---|---|---|
| Optional | The starting date that a resource is available for work at the units specified for the current time period. | |
| Optional | The ending date that a resource will be available for work at the units specified for the current time period. | |
| Optional | The percentage that the resource is available during the specified period. | 
Occurrences
| Minimum: 0 Maximum: Unbounded |